Velomac Flow Meter logoWhatsAppRequest a Quote

Steam Flow Measurement

Steam Flow Measurement: Can 75 t/h from 12 to 4 Bar Deliver 13.5 MW?

A 75 t/h steam turbine project announced for Yara’s Poppendorf fertilizer plant raises a key question for steam flow measurement: how should mass flow, steam state and electrical output be assessed on the same operating basis?

Industrial steam piping and a turbine-generator installation illustrating steam flow measurement and energy balance in a chemical plant.

Steam flow alone cannot establish a turbine-generator's electrical output.

On this page

Quick Answer: What Does 75 t/h Tell Us About Turbine Power?

A steam flow rate of 75 t/h establishes throughput, while verifying electrical output requires the steam's thermodynamic state, the turbine's operating conditions and the applicable conversion efficiencies.

On 21 October 2026, Everllence announced a new steam turbine-generator supply project for Yara’s fertilizer plant in Poppendorf, Germany. The published figures include up to 75 metric tonnes of steam per hour, an inlet pressure of 12 bar, an outlet pressure of 4 bar and an approximate unit output of 13.5 MW.

These figures establish a starting point for engineering analysis. A complete assessment requires the inlet and outlet steam states, the actual mass flow at the relevant operating point and the equipment data needed to calculate power.

The distinction matters because steam mass flow describes throughput, enthalpy change describes the energy transferred during expansion, and electrical measurement establishes the power delivered.

1. The Industrial Case: 75 t/h of Steam from 12 to 4 Bar

Everllence announced the project on 21 October 2026.

At Yara’s Poppendorf site, heat generated during nitric acid production is used to produce steam. Existing steam turbines use this steam to drive two compressors. Under the announced arrangement, exhaust steam leaving the existing turbines at 12 bar will be routed to a new turbine-generator, expanded to 4 bar and used to generate electricity for the plant’s internal grid.

The published project figures are:

  • Steam inlet pressure: 12 bar

  • Steam outlet pressure: 4 bar

  • Maximum steam throughput at full load: Up to 75 metric tonnes per hour

  • Announced turbine-generator output: Approximately 13.5 MW

  • Project status: Equipment supply announcement

Source: Everllence official announcement.

The project illustrates how exhaust steam from an existing industrial process can be used for additional electricity generation.

For instrumentation teams, the engineering question is how to measure the steam entering the new turbine and establish a consistent basis for evaluating its energy input.

The public announcement does not specify the inlet temperature, complete outlet steam state, pressure reference basis or detailed efficiency data needed for an independent power calculation. It describes a planned equipment supply rather than commissioned operating measurements.

2. What Steam Flow Measurement Can Confirm

Three quantities are central to evaluating a steam turbine-generator.

Steam mass flow

Mass flow describes the quantity of steam passing through a measurement point per unit of time.

The announced maximum throughput of 75 t/h converts to approximately 20.83 kg/s.

This figure establishes steam throughput at the stated full-load condition. It does not establish the energy available from each kilogram of steam on its own.

Steam thermodynamic state

The energy transferred during expansion depends on the thermodynamic states at the turbine inlet and outlet.

Pressure and temperature are important inputs. Steam quality, or dryness fraction, also matters when saturated steam may contain liquid droplets.

The inlet and outlet specific enthalpies are needed to establish the enthalpy change across the turbine. These values depend on the actual steam states rather than pressure alone.

Electrical output

Electrical output describes the power delivered by the generator at the defined measurement boundary.

The announced unit output is a project specification. Actual operating output depends on the steam conditions, equipment characteristics, conversion losses and operating point.

For an energy balance, it is also important to distinguish generator output from net electrical output after auxiliary consumption.

A flow reading, a thermodynamic calculation and an electrical power measurement answer different questions. They need to be assessed together when verifying the turbine's energy balance.

For the wider boiler-to-turbine boundary, see Waste-to-Energy Steam Flow Measurement.

3. How to Check the Turbine Energy Balance

For a simplified steady-flow turbine, assuming negligible heat transfer and changes in kinetic and potential energy, the approximate shaft-power relationship is:

Shaft power (kW) ≈ Steam mass flow (kg/s) × Actual enthalpy drop (kJ/kg)

The actual enthalpy drop is the inlet specific enthalpy minus the outlet specific enthalpy.

The terms mean:

  • Steam mass flow: The amount of steam passing through the turbine per second, measured in kg/s.

  • Inlet specific enthalpy: The energy per kilogram of steam entering the turbine, measured in kJ/kg.

  • Outlet specific enthalpy: The energy per kilogram of steam leaving the turbine, measured in kJ/kg.

  • Shaft power: The approximate mechanical power produced by the turbine, measured in kW.

The units are consistent because one kilojoule per second equals one kilowatt.

To estimate shaft power from inlet conditions and outlet pressure, engineers need a suitable turbine expansion calculation to establish the outlet state. The predicted electrical output must then account for mechanical and generator conversion losses, with the power measurement boundary clearly defined.

A numerical consistency check

The announced maximum steam flow converts as follows:

75 t/h = 75,000 kg/h

75,000 kg/h divided by 3,600 seconds per hour = approximately 20.83 kg/s.

If the announced 13.5 MW output and the maximum 75 t/h flow refer to the same operating point, the ratio is:

13,500 kW divided by 20.83 kg/s = approximately 648 kJ/kg.

This represents an implied electrical output of approximately 648 kJ per kilogram of steam, under that assumption.

This ratio is a screening calculation, not a measured enthalpy drop or a verified turbine energy balance.

The next step is to compare it with the inlet and outlet steam properties, the turbine's design basis and the applicable conversion efficiencies.

The public announcement does not provide enough information to complete that verification independently. The pressure reference basis must also be established before calculating steam properties.

The ratio alone is therefore a reason to check the underlying design data before drawing a conclusion about the relationship between flow and electrical output.

4. Define the Steam Flow Measurement Boundary First

The proposed primary measurement point is the steam line feeding the new turbine inlet, subject to confirmation against the actual piping and instrumentation diagram (P&ID).

The objective is to measure the steam entering the new turbine rather than using an aggregate figure for the entire plant.

Before finalizing the measurement location, engineers should establish:

  • Whether all steam entering the new turbine passes through the proposed measurement point.

  • Whether bypass lines or parallel paths can carry steam around the meter.

  • Whether branches, drains or other steam users affect the measurement boundary.

  • How startup, shutdown and turbine trip conditions change the flow path.

  • Whether an additional outlet measurement is required for the intended steam balance.

In an ideal steady-state system with one inlet, one outlet, no additional mass streams and no accumulation, inlet and outlet mass flow are approximately equal.

Actual installations may include additional paths or mass streams. The measurement boundary should therefore follow the real piping arrangement.

The published throughput figure alone cannot establish where the meter should be installed. The project P&ID and the intended measurement purpose must determine the final location.

A defined boundary also allows process, instrumentation and energy-management teams to work from the same measurement basis.

5. Check Steam State Before Flowmeter Selection

Steam state is a key input to flowmeter selection and the interpretation of measured flow.

The Steam Measurement application page brings together the steam-state, operating-range and installation checks.

Pressure and temperature

Confirm the normal and maximum operating pressure and temperature at the proposed meter location.

The pressure basis must be specified as absolute or gauge pressure. This distinction matters when calculating steam properties and density.

Pressure and temperature also affect the relationship between actual volumetric flow and mass flow.

Steam quality

Determine whether the steam is superheated, dry saturated or potentially wet.

For superheated steam, pressure and temperature can establish the thermodynamic state when the applicable properties are known. For a saturated liquid-vapour mixture, pressure and temperature alone do not determine the dryness fraction.

Where liquid droplets may be present, their effect on the selected measurement principle and installation must be assessed.

Pressure and temperature compensation alone cannot establish the liquid content of wet steam. The actual steam condition must be considered when reviewing measurement suitability.

Operating flow range

The published 75 t/h figure describes maximum throughput at full load. It is not a complete operating envelope.

Engineers should establish:

  • Minimum stable operating flow.

  • Normal operating flow.

  • Maximum flow at the relevant design condition.

  • Startup and shutdown flow conditions.

  • Flow changes during existing turbine load adjustments.

Minimum, normal and maximum flow are all relevant to meter sizing. Selecting an instrument from the maximum value alone leaves important operating conditions unassessed.

Installation and pressure loss

Confirm the pipe diameter, available straight run, upstream flow disturbances, vibration, drainage arrangement and maintenance access.

The meter's own pressure loss must also be assessed against process requirements. The turbine's intended expansion from 12 bar to 4 bar defines its operating conditions, while the pressure loss introduced by the meter is a separate consideration.

6. Which Velomac Flowmeters May Be Relevant?

For a suitable dry-steam application, a Vortex Flowmeter is a candidate for evaluation. Other approved technologies may also be considered when their application requirements match the actual process conditions.

Vortex Flowmeter

Review the steam state, velocity range, pipe size, installation conditions and required compensation.

Swirl Flowmeter

Assess the operating envelope, pipe arrangement, pressure loss and the selected instrument's application limits.

V-Cone Flowmeter

Review differential-pressure measurement requirements, available pressure loss and installation arrangement.

Balanced Differential Pressure Flowmeter

Assess the required operating range, differential-pressure requirements and applicable installation conditions.

These are candidates for application review, not a confirmed selection for the Yara project.

The actual choice depends on the steam state, minimum and maximum flow, pipe diameter, operating pressure and temperature, allowable pressure loss, installation space and project requirements.

Where mass flow is calculated from volumetric flow, the pressure and temperature compensation basis must also be defined and checked against the actual steam state.

The measurement requirement should determine the technology shortlist. The final product selection follows from the verified application data.

7. What Engineers Should Prepare Before Flowmeter Sizing

A flowmeter application review should begin with a consistent set of process and installation information.

Process conditions

  • Medium and expected steam state.

  • Minimum, normal and maximum flow.

  • Operating and maximum pressure.

  • Operating and maximum temperature.

  • Startup, shutdown and load-change conditions.

Piping and installation

  • Nominal pipe size and pipe details.

  • Proposed meter location and available straight run.

  • Bypasses, branches, drains and parallel flow paths.

  • Vibration and other installation constraints.

  • Allowable pressure loss and maintenance access.

Measurement and integration

  • Whether the required output is volumetric flow, calculated mass flow or totalized mass.

  • Pressure and temperature compensation requirements.

  • Required signal output and DCS / PLC integration.

  • Calibration and documentation requirements.

  • Whether additional measurements are needed for the intended turbine energy balance.

Preparing this information before selection establishes a clearer basis for reviewing the measurement point and finalizing the instrument specification.

8. Practical Checklist for Steam Flow Measurement

Before finalizing a flowmeter specification, confirm the following:

  • The measurement point represents the steam entering the intended turbine.

  • Bypasses, branches and other flow paths have been identified.

  • Minimum, normal and maximum flow conditions are available.

  • Operating pressure and temperature are defined, including the pressure reference basis.

  • Steam quality or superheat conditions have been assessed.

  • The required mass-flow calculation and compensation basis are clear.

  • Meter pressure loss fits the process requirements.

  • Pipe size, straight run and installation constraints are documented.

  • Output signals and integration requirements are confirmed.

  • The turbine energy balance uses a consistent operating basis for steam flow, steam state and electrical output.

Completing these checks before selection establishes a common basis for the technical specification and subsequent procurement.

9. From Measurement Specification to Site Delivery

For overseas buyers, confidence in a flowmeter order extends beyond the selection calculation. The agreed instrument configuration, applicable documentation and shipping arrangements also need to be clear before dispatch.

The same attention given to the measurement boundary should carry through to the final order documents and delivery process.

Confirm the final configuration

Before production or dispatch, check the approved datasheet against the purchase order.

Confirm the medium, pipe size, flange standard, pressure rating, wetted materials, operating range, power supply and signal output.

Any configuration changes should be confirmed in writing so the production and delivery teams work from the same specification.

Agree on calibration and documentation

Before placing the order, confirm which calibration records, inspection reports and compliance documents are required and included in the agreed scope.

Where applicable, check that the instrument identification, model and serial number correspond to the supplied documentation.

The applicable documents should be agreed before the order is finalized. Requirements vary according to the project, destination and purchasing specification.

Confirm export packing

For sea freight, confirm how the instrument will be protected during handling, storage and transportation.

Depending on the instrument configuration and shipping conditions, the packing review may cover:

  • Protection for flange faces and connection surfaces.

  • Protection for displays and electrical connections.

  • Moisture protection and suitable internal restraint.

  • Crate or package identification.

  • External packing dimensions and gross weight.

The actual packing arrangement should suit the equipment and the agreed shipping conditions.

Clarify freight and customs responsibilities

Before dispatch, confirm the shipping method, agreed trade terms, estimated dispatch timing, freight responsibilities and insurance arrangements.

The buyer and supplier should also establish who will arrange export clearance, import clearance and destination-specific documentation.

Packed dimensions, gross weight and package count should be confirmed before freight is finalized. Shipping and customs requirements vary by destination and agreed trade terms, so the applicable responsibilities should be documented in the quotation or purchase order.

Prepare for receipt and installation

Before shipment, confirm which dispatch documents and shipment details will be supplied.

On arrival, the receiving team should compare the shipment against the packing list, check the package condition and record any visible transport damage. Storage and handling before installation should follow the applicable equipment instructions.

The installation team should have the approved instrument configuration, connection details and signal requirements available before commissioning.

Packaging, documentation and freight arrangements should be confirmed for the specific order before dispatch. This gives the buyer and supplier a clear reference for what will be delivered and which responsibilities each party has accepted.

10. Common Questions

Can a 75 t/h steam flow reading confirm 13.5 MW of electrical output?

The flow reading establishes steam throughput. Verification also requires the inlet and outlet steam states, the applicable turbine-generator conversion efficiencies and electrical output measured at a defined boundary. The published figures provide a starting point for the calculation.

Is a pressure reduction from 12 bar to 4 bar enough to calculate turbine power?

No. The pressure levels define part of the expansion condition. Inlet and outlet thermodynamic states, mass flow and conversion efficiencies are also required.

Can pressure and temperature compensation establish steam quality?

For superheated steam, pressure and temperature can establish the thermodynamic state. For saturated wet steam, they do not independently establish the dryness fraction.

Is 75 t/h enough information to size a steam flowmeter?

No. It establishes a maximum flow figure for the announced application. Meter sizing also requires minimum and normal flow, operating pressure and temperature, pipe size, installation details and the required measurement range.

Which Velomac flowmeter should be considered first for steam?

A Vortex Flowmeter is a candidate for suitable dry-steam conditions. Swirl Flowmeter, V-Cone Flowmeter and Balanced Differential Pressure Flowmeter may also be evaluated when their application requirements match the process. Final selection requires a review of the actual operating conditions.

11. Review the Measurement Point Before Selection

For industrial steam systems, the flowmeter specification should reflect the actual measurement boundary, steam state and operating range.

Velomac provides manufacturer-direct flowmeter application review covering medium, pipe size, minimum / normal / maximum flow, pressure, temperature, installation conditions and signal requirements.

If your team is reviewing a similar steam measurement point, prepare the available operating data and piping arrangement for a technical review. For overseas orders, confirm the applicable calibration records, documentation, export packing and freight responsibilities against the specific quotation before dispatch.

Key points

  • Steam mass flow establishes throughput, while steam state determines the energy change during expansion.
  • The 648 kJ/kg ratio is a conditional calculation, not a verified enthalpy drop.
  • Define the measurement boundary before confirming the flowmeter location.
  • Confirm steam state, pressure basis, temperature and the full operating flow range.
  • Evaluate pressure loss, installation constraints and compensation requirements before selection.
  • Confirm the instrument configuration, applicable documents, packing arrangements and freight responsibilities before dispatch.

Selection support

Send Site Details for a Better Recommendation.

Share the fluid, pipe size, flow range, pressure, temperature and application background. Velomac will review the conditions and suggest the next step.

Request a Quote